See reballasting in All languages combined, or Wiktionary
{ "head_templates": [ { "args": { "1": "-" }, "expansion": "reballasting (uncountable)", "name": "en-noun" } ], "lang": "English", "lang_code": "en", "pos": "noun", "senses": [ { "categories": [ { "kind": "topical", "langcode": "en", "name": "Rail transportation", "orig": "en:Rail transportation", "parents": [ "Transport", "All topics", "Fundamental" ], "source": "w" }, { "_dis": "68 32", "kind": "other", "name": "English entries with incorrect language header", "parents": [ "Entries with incorrect language header", "Entry maintenance" ], "source": "w+disamb" }, { "_dis": "66 34", "kind": "other", "name": "Pages with 1 entry", "parents": [], "source": "w+disamb" }, { "_dis": "67 33", "kind": "other", "name": "Pages with entries", "parents": [], "source": "w+disamb" } ], "examples": [ { "ref": "1951 June, John L. Buckland, “The Semmering Line and its Traffic”, in Railway Magazine, page 414:", "text": "Repair of the many tunnels and high masonry viaducts on the eastern side of Semmering, appears to have necessitated this single-line working, although complete rerailing with long welded rails and resleepering and reballasting are being undertaken.", "type": "quote" }, { "ref": "1961 March, “Talking of trains”, in Trains Illustrated, page 130:", "text": "The most welcome progress from a short-term viewpoint, however, is that reballasting of the Trent Valley section is almost completed and as a result accelerations of express passenger trains are likely in this summer's timetable; we hear that over this section alone it should be possible to cut 20min from the timings of three Anglo-Scottish day trains and that other services will be speeded up by 8-15min.", "type": "quote" } ], "glosses": [ "The process of renewing the ballast under railway track." ], "id": "en-reballasting-en-noun-2bNg1kLw", "links": [ [ "rail transport", "rail transport" ], [ "ballast", "ballast" ], [ "railway track", "railway track" ] ], "raw_glosses": [ "(rail transport) The process of renewing the ballast under railway track." ], "tags": [ "uncountable" ], "topics": [ "rail-transport", "railways", "transport" ] } ], "word": "reballasting" } { "head_templates": [ { "args": { "1": "en", "2": "verb form" }, "expansion": "reballasting", "name": "head" } ], "lang": "English", "lang_code": "en", "pos": "verb", "senses": [ { "form_of": [ { "word": "reballast" } ], "glosses": [ "present participle and gerund of reballast" ], "id": "en-reballasting-en-verb-RqrqGXEQ", "links": [ [ "reballast", "reballast#English" ] ], "tags": [ "form-of", "gerund", "participle", "present" ] } ], "word": "reballasting" }
{ "categories": [ "English entries with incorrect language header", "English lemmas", "English non-lemma forms", "English nouns", "English uncountable nouns", "English verb forms", "Pages with 1 entry", "Pages with entries" ], "head_templates": [ { "args": { "1": "-" }, "expansion": "reballasting (uncountable)", "name": "en-noun" } ], "lang": "English", "lang_code": "en", "pos": "noun", "senses": [ { "categories": [ "English terms with quotations", "en:Rail transportation" ], "examples": [ { "ref": "1951 June, John L. Buckland, “The Semmering Line and its Traffic”, in Railway Magazine, page 414:", "text": "Repair of the many tunnels and high masonry viaducts on the eastern side of Semmering, appears to have necessitated this single-line working, although complete rerailing with long welded rails and resleepering and reballasting are being undertaken.", "type": "quote" }, { "ref": "1961 March, “Talking of trains”, in Trains Illustrated, page 130:", "text": "The most welcome progress from a short-term viewpoint, however, is that reballasting of the Trent Valley section is almost completed and as a result accelerations of express passenger trains are likely in this summer's timetable; we hear that over this section alone it should be possible to cut 20min from the timings of three Anglo-Scottish day trains and that other services will be speeded up by 8-15min.", "type": "quote" } ], "glosses": [ "The process of renewing the ballast under railway track." ], "links": [ [ "rail transport", "rail transport" ], [ "ballast", "ballast" ], [ "railway track", "railway track" ] ], "raw_glosses": [ "(rail transport) The process of renewing the ballast under railway track." ], "tags": [ "uncountable" ], "topics": [ "rail-transport", "railways", "transport" ] } ], "word": "reballasting" } { "categories": [ "English entries with incorrect language header", "English lemmas", "English non-lemma forms", "English nouns", "English uncountable nouns", "English verb forms", "Pages with 1 entry", "Pages with entries" ], "head_templates": [ { "args": { "1": "en", "2": "verb form" }, "expansion": "reballasting", "name": "head" } ], "lang": "English", "lang_code": "en", "pos": "verb", "senses": [ { "form_of": [ { "word": "reballast" } ], "glosses": [ "present participle and gerund of reballast" ], "links": [ [ "reballast", "reballast#English" ] ], "tags": [ "form-of", "gerund", "participle", "present" ] } ], "word": "reballasting" }
Download raw JSONL data for reballasting meaning in English (2.3kB)
This page is a part of the kaikki.org machine-readable English dictionary. This dictionary is based on structured data extracted on 2024-11-06 from the enwiktionary dump dated 2024-10-02 using wiktextract (fbeafe8 and 7f03c9b). The data shown on this site has been post-processed and various details (e.g., extra categories) removed, some information disambiguated, and additional data merged from other sources. See the raw data download page for the unprocessed wiktextract data.
If you use this data in academic research, please cite Tatu Ylonen: Wiktextract: Wiktionary as Machine-Readable Structured Data, Proceedings of the 13th Conference on Language Resources and Evaluation (LREC), pp. 1317-1325, Marseille, 20-25 June 2022. Linking to the relevant page(s) under https://kaikki.org would also be greatly appreciated.